PennDOT crews will be painting lines, cleaning bridges and more along Nazareth area roads.

Make your commute a little easier by avoiding the following road work this week:

  • From 9 a.m. to 3 p.m. April 9 to 10, crews will be painting lines on Route 33 in the area of the Belfast Road exit in and townships. There will be southbound lane restrictions.
  • From 9 a.m. to 3 p.m. on April 11, crews will be doing drainage work along Bushkill Center Road between Jacobsburg and E. / W. Douglasville roads in Bushkill Township. There will be lane restrictions.
  • From 9 a.m. to 3 p.m. on April 11, crews will be doing work on Newburg Road between Route 248 and E. Main Street in and townships. There will be lane restrictions for bridge cleaning.
  • From 8 p.m. to 6 a.m. April 11 to 12, crews will be doing drainage work on Route 33 between Route 512 and the Monroe County line in Plainfield Township and Wind Gap. There will be lane restrictions in both directions for pipe inspections.
  • From 9 a.m. to 3 p.m. on April 12, crews will be doing drainage work along Bushkill Center Road between E. / W. Douglasville and W. Moorestown roads in Bushkill Township. There will be lane restrictions.
  • From 9 a.m. to 3 p.m. on April 13, crews will be doing drainage work along Bushkill Center Road between W. Moorestown Road and Bushkill Drive in Bushkill Township. There will be lane restrictions.